Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/nailbendersgroup/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the stm_post_type domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/nailbendersgroup/public_html/wp-includes/functions.php on line 6114
RADAR PADS AT KABUL INTERNATIONAL AIRPORT – Nailbendersgroup

RADAR PADS AT KABUL INTERNATIONAL AIRPORT

RADAR PADS AT KABUL INTERNATIONAL AIRPORT

e project consists of the design and construction of the Radar Pads at Kabul international Airport, Under Contract No. W917PM-09-C-0032. With US Army Corps of Engineers.
e project is defined as the design, material, labor, and equipment to construct two sta barracks, one vehicle maintenance facility, perimeter walls with guard towers with all utilities (water, electrical distribution, communications, and sewage holding tanks/sewer lines), demolition and other infrastructure for a design population of 180 additional persons.

Design documents, to include plans and specifications, are provided herein for the expansion and associated site work.

Client
US ARMY CORPS OF ENGINEERS
Year
10-14-2009
Contract No
W917PM-09-C-0032